Preliminary Estimates

Evaluate proposed budget guidelines for construction costs with Client, Golf Course Architect,
and selected Contractor.

Final Design Development Phase

Provide detailed irrigation construction plans covering-
        Mainline piping layout
        Wiring layout and station assignments
        Irrigation details
        Basic pump station layout
        Estimate of materials for project
        Cost estimate for construction

Construction Documentation

1. Provide detailed irrigation installation and construction specifications for project.
2. Provide client with irrigation construction plans, technical specifications and bid document forms.

Bidding

1. Assist Client with pre-bid meeting
2. Assist Client in negotiations with Contractor
3. Assist Client with pre-construction meeting with Irrigation Contractor

Field Staking

1. Perform field staking of key irrigation system components.
2. Provide “as-staked” plans after each staking visit.

Construction Observation

1. Ensure installation procedures of Contractor meet industry standards.
2. Make punch-list for final adjustments prior to completion of project by Contractor.

GPS Mapping/As-Builts

Prepare survey-grade GPS as-built (record drawings) of irrigation system and site features.

Central Database Programming

Program and set up irrigation central computer.

Training

Provide personal instruction and assistance to client in central system operation.

SERVICES

Golf Course and Commercial Irrigation Design

Spot Water Management offers an expert consultant evaluation of the existing irrigation system and preliminary design for a new irrigation system.

item3b
spotwaterlogo0101a1

© 2010 SpotWater Management, Inc.

item5a

SERVICES

sidemenuslicesrest09
sidemenuslicesrest09a
sidemenuslicesrest09b
sidemenuslicesrest09c
sidemenuslicesrest09e
sidemenuslicesrest09f
sidemenuslicesrest09g
sidemenuslicesrest23a
sidemenuslicesrest25a

Preliminary Irrigation Design Services

1. Review layouts and establish project design criteria that considers-
 

 

 

2. Prepare preliminary sprinkler head coverage layout with initial piping configuration and coordinate cost projections.
3. Provide client with information regarding pump station electrical requirements, sizing, etc.

Irrigation system limits

Design and Construction time frames

Irrigation Manufacturer's Products

Pump station location or P.O.C.

Project Contracts

Contractor Requirements